Re: Latest Status of Fukushima Nuclear Plant (UPDATED April 12, 2011)
« Reply #75 on: April 12, 2011, 11:53:26 AM »
Latest report, Tuesday, April 12:

Quote
UPDATE AS OF 11:30 A.M. EDT, TUESDAY, APRIL 12:
Tokyo Electric Power Co. (TEPCO) is planning to pump highly radioactive water from reactor 2 into a condenser, as the utility works to control radiation and restore cooling systems at the Fukushima Daiichi nuclear power plant.

TEPCO continues to inject cooling water into reactors 1, 2 and 3 and to spray water into the used fuel pools for reactors 1-4. TEPCO also continues injection of nitrogen gas into the containment vessel of reactor 1 to prevent a possible explosion of hydrogen that may be accumulating inside.

A fire that broke out early Tuesday at a distribution switchboard near the south water discharge channel for reactors 1-4 was extinguished without interruption of reactor cooling operations or the release of radioactivity, TEPCO said.

The crisis rating of the Fukushima Daiichi accident was raised from 5 to 7 on the seven-level International Nuclear and Radiological Event Scale by the Japan Nuclear and Industrial Safety Agency. The new level, the highest on the scale, designates Fukushima as a “major accident.” The new rating puts the Japanese incident on the same level as the 1986 Chernobyl accident—even though Japanese authorities estimate that radiation released at Fukushima is only 10 percent of the amount released from the Ukrainian plant.

Authorities said much of the high-level radiation leaked from reactor 2 on March 15 and 16, early in the accident. Abnormalities in the reactor’s suppression pool caused the radiation release, the Japan Nuclear Safety Commission said. Radiation continues to leak from the suppression pool, the commission said, but the volume has dropped considerably.

For the new rating, the Japan Nuclear and Industrial Safety Agency combined the accidents at reactors 1, 2 and 3 as a single event. Previously, separate level 5 ratings had been applied to each reactor. The earlier level 3 rating (“serious incident”) still applies to reactor 4.

Japanese authorities may revise the INES rating at the power plant as more information becomes available.



doc
« Last Edit: April 12, 2011, 11:58:13 AM by TVDOC »

Offline MP_Sarge

  • Full Member
  • ***
  • Posts: 438
  • Reputation: +35/-70
Re: Latest Status of Fukushima Nuclear Plant (UPDATED April 12, 2011)
« Reply #76 on: September 05, 2011, 05:55:12 AM »
Quote
A government map of soil radiation levels mainly within a 100-kilometer radius of the disaster-hit Fukushima No. 1 Nuclear Power Plant shows 34 locations with levels of cesium-137 exceeding 1.48 million becquerels per square meter, the level that was used for determining bans on living near the Chernobyl plant.

The map was released on Aug. 29 by the Ministry of Education, Culture, Sports, Science and Technology (MEXT). Cesium-137 has a half-life of around 30 years. The greatest concentration was found in the town of Okuma, which holds part of the plant, at 15.45 million becquerels per square meter. The six municipalities with levels over the Chernobyl level are Okuma, Minamisoma, Tomioka, Futaba, Namie, and Iitate.

http://mdn.mainichi.jp/mdnnews/national/news/20110830p2a00m0na013000c.html
Nunquam Honorandum Nisi Merito